
Russia, China sign deal to advance Power of Siberia 2 gas pipeline
The existing 3,000km Power of Siberia pipeline is expected to reach its planned capacity of 38bcm in 2025. Credit: ENOEYZ3194/Shutterstock.com. Russia and China have signed a legally binding memorandum to move forward with construction of the Power of Siberia 2 pipeline. The pipeline is expected to deliver an extra 50 billion cubic metres (bcm) of gas…